Great Plains Manufacturing, Inc. Air Cart Pre-Delivery 9
10/10/2008 196-444Q
Spot Air Cart
Choose an assembly location with ample room. Allowing
room for turns, the complete assembly of tractor, drill and
air cart may require a space with a:
length over 100 feet (30m) and
width of 50 feet (15m) without markers, or
width of 83 feet (25m) with markers.
!
CAUTION
Check for overhead lines, particularly if the drill will have
markers. The air cart requires at least 12ft (7.6m) vertically,
and more if auger deployment is contemplated.
Refer to Figure 5
20. Move the air cart to the final assembly area.
Block the wheels.
21. Verify that the cart has the correct sprocket for the
drill. See “Cart Drive System” in the Air Cart Opera-
tor manual.
Install Cab Components
If the customer tractor is available, install the Seed Moni-
tor in the tractor cab. This is described under “Prepara-
tion and Setup” in the Air Cart Operator manual.
Figure 5
Assembly Clearances
(without markers)
40 ft
10.2m
70 ft
21.3m
1
B
F
L
R
1