Great-plains 3P1006NT Operator Manual User Manual Page 84

  • Download
  • Add to my manuals
  • Print
  • Page
    / 102
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 83
151-144M Table of Contents Index 2011-12-20
80 3P1006NT Table of Contents Index Great Plains Manufacturing, Inc.
Appendix B - Pre-Delivery
Figure Callouts
Connector Identification
Refer to Figure 49
JIC - Joint Industry Conference (SAE J514)
Note straight threads and the
37° cone on “M” fittings (or 37° flare on “F”).
ORB - O-Ring Boss (SAE J514)
Note the straight threads and,
elastomer O-Ring .
Fittings needing orientation, such as the ell above,
also have a washer and
jam nut (“adjustable thread port stud”)
Unload Truck
The 3P1006NT drill is delivered by flatbed truck. When
coordinating the unload with the Great Plains driver, plan
to position the partially assembled drill at a spot with:
at least 10 ft. (3 m) clearance behind the press
wheels,
tractor access in front,
ample light,
flat, level and dry surface.
Tools required for installation:
hoist with 500 lb (277 kg) capacity,
basic hand tools
to ,
to
callouts identify components in the currently
referenced Figure or Figures. These numbers
may be re-used from page to page.
to callouts reference existing parts exchanged or
temporarily removed parts. The descriptions
match those on the cartons, bags or item tags,
as well the current Parts Manual. (Ref.Page)
to callouts reference new parts The descriptions
match those in the current drill Parts Manual.
8
7
6
5
4
1
2
3
Figure 49
Hydraulic Connector ID
25188
Fittings Torque Values
Fitting Ft-Lbs N-m
9
16
JIC 18-20 24-27
9
16
ORB w/jam nut 12-16 16-22
9
16
ORB straight 18-24 24-32
3
4
JIC 27-39 37-53
3
4
ORB w/jam nut 20-30 27-41
3
4
ORB straight 27-43 37-58
1 9
a z
11
21
101
189
1
2
3
4
5
6
7
8
Page view 83
1 2 ... 79 80 81 82 83 84 85 86 87 88 89 ... 101 102

Comments to this Manuals

No comments