Great-plains 1500TM Predelivery Manual User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 38
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
586-535Q 12/12/2013
8 1200-1500TM Great Plains Manufacturing, Inc.
Assembly
Valves
Note: Bolts needed in these next steps will be bolted on parts
or located in a bag on center frame. The hoses will be
hooked to valves and cylinders and hoses running to
hitch will be rolled up on center frame. The system will
be charged. Once hitch assembly is installed hoses will
need routed on hitch, see Hose Routing below
Refer to Figure 5
17. Install the counter balance valve to block on center
frame with 5/16 x 3 1/2 hex bolts and 5/16 lock wash-
ers.
18. Align holes in double block tee in position shown,
secure with 5/16 x 4 bolts , 5/16 lock washers and 5/16
nuts.
19. Install the lock valve to the top of the bracket on center
frame with 1/4 x 2 Gr. 5 hex bolts , 1/4 lock washers
and 1/4 nuts.
20. Bolts may be tightened to specs, See “Torque Values
Chart” on page 19.
Hose Routing
Refer to Figure 6
Note: Be sure hoses running from valves to cylinders are
routed as shown before installing trusses . The hos-
es need to route in locations shown with arrows, on top
of center frame tubes to cylinders.
3
4
5
U
D
F
B
L
R
6
Figure 5
Valves
42943
1
2
1
2
3
4
5
6
2
1
Figure 6
Hose Routing
43124
3
2
3
1
2
3
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 37 38

Comments to this Manuals

No comments