Great-plains PT1230 Predelivery Manual User Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 15
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
7
Section 1 Assembly
10/14/08
PT1230 Folding Pull-Type Planter 401-072M
Great Plains Mfg., Inc.
8. Mount tanks. Unstrap the tanks from the shipping pal-
let. Use two people to position each tank (1) on the
weldment (2). Position each tank so the drain plug (3)
is toward the inside. Strap tanks to weldment using
tank straps (4) and 1/2-by-4-inch bolts (5).
Figure 1-16
Install Tanks
16772
9. Plumb tanks. Assemble fittings as shown in Figure 1-
17.
From the roll of 1 1/2-inch hose, cut hoses to connect
fittings. As a guide, use the approximate hose lengths
(in inches) on the illustration. Hose lengths will vary
from unit to unit.
15
15
79 1/2
58
Figure 1-17
Plumb Tanks
16777
Route hoses through holders (1) on fertilizer tank
weldment. Use worm clamps to secure hoses on fit
-
tings.
16898
1
1
Figure 1-18
Tanks Plumbed
10. Plumb squeeze pumps.
a. From the roll of 1-inch hose cut two hoses that are
each about 13 feet 6 inches long. Check the dis
-
tance between the T-fitting (1) and squeeze
pumps on your planter before cutting hose.
b. Route hoses over planter frame as shown in illus-
tration. Route hoses through wing housings (2)
when planter is folded.
c. Use hose clamps (3) to secure fertilizer hoses to
the planter frame in six location–four on the center
section and one on each wing. Use hose ties to
bundle the hoses together and to the planter
frame. Assemble clamps as shown in insert.
16897
Figure 1-19
T-Fitting to Squeeze Pump
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15

Comments to this Manuals

No comments