Great-plains 3000TM Operator Manual User Manual Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
Great Plains Manufacturing, Inc. Table of Contents Index Operating Instructions 25
10/29/2013 Table of Contents Index 586-536M
Field Operation
This implement is designed to be pulled in the lowered
field position (including wide turns). Lifting for short dis-
tances to clear residue clogs is acceptable. Lifting for
tight turns or reverse moves is required.
Equipment Damage Risk:
Lift for tight turns and reverse moves. Tight turns can result in
a section moving backward. Never back up with harrows on
the ground. If the inside tire stops or rolls backward, the turn is
tight and requires lift.
Field Set-Up Checklists
Use the following tables to develop a final checklist for
your tractor/Turbo Max configuration. Additional or fewer
steps may be necessary depending on tractor features,
Turbo Max options and accessories.
Final Checklist
Mechanical Checklist Page
Turbo Max hitched 14
Hitch pin locked -
Safety chain secured to tractor or leading
implement
14
Parking jack stowed 14
Check all tire pressures 32
Transport locks and locking valves are in
the field position
16
Hydraulic System Checklist Page
Check tractor hydraulic reservoir full -
Make hydraulic connections 15
Inspect connections for leaks -
Unfold Implement -
Perform all steps in “Pre-Start Checklist” on page 23
and “Final Checklist” on this page.
Do not make short radius turns with the implement in the
ground.
Note: If you stop in the middle of a pass, raise the imple-
ment and back up 10’ before resumption of tilling.
Electrical Checklist Page
Verify electrical hookups solid, or connec-
tor securely stowed if not using lights in
field.
15
First Pass Operation Checklist Page
1. Implement unfolded and aligned for first
pass.
-
2. Pull forward, lower Turbo Max, and begin
tilling for a short distance.
-
3. Stop. Assess:
coulter depth
finishing attachment operation
-
4. Make necessary adjustments 26
Sharp Field Turns Checklist Page
1. Raise Turbo Max -
2. Make turn -
3. Lower Turbo Max -
4. Resume tilling. -
Ending Tilling Checklist Page
1. Suspend operations as above -
2. Lift implement -
3. Set tractor for fold 17
4. Fold wings -
5. Place locking valves in transport position 16
6. Place transport locks in transport position 16
7. Lower implement on to transport locks -
8. Lights ON for transport -
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 43 44

Comments to this Manuals

No comments