Great-plains 3S-3000 Assembly Instructions User Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 15
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
195-307M 2/17/2005
Great Plains Mfg., Inc.
Point-Row Option 2005+
4
Refer to Figure 5
5. Assemble new 20" hoses (12) to filters (18).
Assemble3/4" elbows (20) into top-front ports
of the pressure control valve. Using elbows
(19), connect filters to the control valves. Us-
ing tee fittings (13), assemble new 18" hoses
(14) and 86" hoses (15) to bottom ports. Us-
ing adaptor fittings (16), assemble remaining
86" hoses (17) to rear ports.
6. Route 86" hoses (15 and 17) from new pres-
sure control valves back to drill frame.
7. Connect hoses to new block. Connect 21"
hoses to lower-front ports in block. Connect
18" hoses to top-front ports in block. Connect
hoses to block in same order as valves. (For
example, connect hoses from center valve to
center ports in block.)
8. Install the new pressure gauge using thread
sealant on gauge threads only.
22960
Figure 5
Hoses
Page view 3
1 2 3 4 5 6 7 8 9 ... 14 15

Comments to this Manuals

No comments