Great-plains ADI445 Operator Manual User Manual Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
20
Section 1 Assembly and Setup
Model 2250 Air Drill Implement 160-192M 5/11/05
Great Plains Mfg., Inc.
Distribution Towers and Hoses
Refer to Figure 1-19 for tower mounting locations. Choose
implement configuration to determine tower placement.
1. Refer to Figure 1-17, install a tower support bracket at
each location using the 1/2” u-bolt (#1), 1/2” lock
washers (#2), and 1/2” nuts (#3)
NOTE: For best results, distribution towers should be
mounted as vertically as possible. A tower that leans
significantly to one side may cause uneven distribu-
tion, particularly when operating on hillsides.
Mounting Tower
Figure 1-17
14546
2. Position a tower on the bracket and secure with 2 1/2”
x 2 1/2” u-bolts. The bottom of the lower round plate
should be approximately 31 1/2 inches above the
frame members. The tower should be turned so that
inlet tube is pointed toward the center of the imple-
ment. The center tower inlet should face the front of
the implement, see Figure 1-18.
Tower Positioning
Figure 1-18
14499
Frame Leveling Measurement
Figure 1-16
15207
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 47 48

Comments to this Manuals

No comments