Great Plains Mfg., Inc.Installation Instructions 1©Copyright 2007 Printed 02/20/2008 151-128MGrease Bank Kit7- and 10-Foot EWNT DrillsUsed with:• 705
Great Plains Mfg., Inc.2 Grease Bank Kit151-128M 02/20/2008Before You StartReview these instructions, with the following objectives ateach step:• Safe
Great Plains Mfg., Inc.Installation Instructions 302/20/2008 151-128MSelect Bulkhead LocationsPre-Assemble Bulkhead(s)Refer to Figure 26. For 705, sel
Great Plains Mfg., Inc.4 Grease Bank Kit151-128M 02/20/2008Weld BulkheadsTack Weld Mount PlatesRefer to Figure 4If you prefer to fully protect the mou
Great Plains Mfg., Inc.Installation Instructions 502/20/2008 151-128MInstall Zerks on BulkheadRefer to Figure 6Note: The fitting connector has three p
Great Plains Mfg., Inc.6 Grease Bank Kit151-128M 02/20/2008Install Tubing28. Select the:The tubing from the grease bank to the coulters is sup-plied a
Great Plains Mfg., Inc.Installation Instructions 702/20/2008 151-128MSecure Tubing39. When all the coulters have had tubing routed andattached, begin
Great Plains Mfg., Inc.8 Grease Bank Kit151-128M 02/20/2008Great Plains Manufacturing, Inc.Corporate Office P.O. Box 5060Salina, Kansas 67402-5060 USAP
Comments to this Manuals