Great-plains 1005 Assembly Instructions User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 8
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
Great Plains Mfg., Inc.
Installation Instructions 7
02/20/2008 151-128M
Secure Tubing
39. When all the coulters have had tubing routed and
attached, begin drawing up the cable ties in stages.
Leave slack for gentle bends at the back of each
grease bank.
Make sure tubing is flat against the tool bar.
Leave slack for gentle bends down to coulters, and
slack for possible future coulter height adjustments.
Closeout
40. At each bank zerk, pump until only grease (and no
air) emerges at the coulter pivot.
There should be minimal resistance until grease
reaches the coulter, and then only modest resis-
tance.
If there is strong resistance, check for defective zerk,
fitting blockage, tubing blockage and grease pump
malfunction.
If resistance suddenly drops, check for tubing leaks
or disconnections.
Maintenance
Coulter Pivot Arms: At Grease Bank
1 zerk each pivot; 1 or 2 banks
Type of Lubrication: Grease
Quantity: 5 pumps or until grease emerges
27150
8
Page view 6
1 2 3 4 5 6 7 8

Comments to this Manuals

No comments