11/25/2013 550-466Q-ENG
Great Plains Manufacturing, Inc. 7
Assembly
Refer to Figure 5
Install Center Brace Bar & Torque Tube
1. Once the center Frame has been uncrated and put
on stands, the torque tube maybe installed.
2. Carefully raise the torque tube with an overhead
hoist and secure with 1 1/4 x 6 pins , 3/8 x 2 1/4 Gr.
8 hex bolts and 3/8 top lock nut.
3. Install pre-assembled hub assembly or brake hub
assembly (if machine is equipped with brakes) ,
using the 1 x 4 5/8 pin and secure with 3/8 x 2 roll
pin.
4. Attach the tire/wheel assembly to hub assembly 3)
and secure with 5/8 lug nuts .
5. Now install 3.50 x 8 x 1.25 cylinders using 1 x 3 1/
8 pins , 1.5 x 1.0 x.075 machine washers and 3/16
x 2 cotter pins.
Install cylinder transport locks to cylinders using
the 3/8 x 3 pins and clip pin.
6. Carefully move center brace bar into position with
fork truck or overhead hoist. Secure with 3/4 x 2 hex
bolts , 3/4 lock washers and 3/4 hex nuts.
7. All bolts may be tightened to specs, See “Torque
Values Chart” on page 37. Attach plastic end caps
to all open ends of 4 x 3 tube.
1
2
3
4
5
6
7
8
9 7
10
11
12
Figure 5
Center Brace Bar & Torque Tube
41544
U
D
F
B
L
R
7
10
8
9
4
2
3
6
5
1
4
3
8
8
9
11
12
12
11