Great-plains NTA3007HD Predelivery Manual User Manual Page 45

  • Download
  • Add to my manuals
  • Print
  • Page
    / 70
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 44
Assembly 41
03/29/2010 166-207Q
Refer to Figure 74
Step 3:
1. Coat pivot holes in frame with antisieze com-
pound.
2. Put shim stack (from Step 2) over pivot hole (be
sure to have nuts facing up).
3. Align wing fold weldment over hole .
4. Put shim stack (from Step 2) over top hole in wing
fold weldment (be sure to have nuts facing down).
5. Install pin from bottom up.
6. Install washers and hand thread on nut .
7. This will allow you to turn pin and align cross hole
at bottom of pin with frame.
8. Put cross bolt in and tighten. Tighten nut to
135 ft. lb torque. Install cotter pin.
Refer to Figure 75
Step 4: Wing Pivot:
1. Coat holes in wings with antisieze compound.
2. Align holes in wing with hole in fold arm .
3. Slide 2 shims between wing and front of arm.
4. Begin to slide pin in. With pin approximately half
way in slide 2 shims between the back side of the
fold arm and wing. Continue to slide pin in.
5. Install washers and hand thread on nut .
6. This will allow you to turn pin and align cross hole
in pin with wing frame.
7. Put cross bolt in and tighten. Tighten nut to
135 ft. lb torque. Install cotter pin.
Figure 74
Wing to Main Frame
31148
6
7
A
B
8
9
10
11
6
A 6
7 6
B
7
8
910
8
11
10
Figure 75
Wing to Fold Arm
31148
16
17
15
14
12
13
18
19
13
13 12
14
15
16
17 18
15
19 18
Page view 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 69 70

Comments to this Manuals

No comments