Great-plains TL350 Operator Manual User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
13
Simba TL
605-039M-ENG
2013-02-27
1. Safety Data
1.5.3 During Operation
Ensure that the working range and the area
around the machine are clear (children!)
before operating the machine.
Always ensure adequate visibility!
Do not stand on the machine while it is in
operation!
Operators must have a valid driving licence
in order to drive on public roads.
The person in charge must:
provide the operator with a copy of the
Operating Instructions.
ensure that the operator has read and
understood the instructions.
make sure that the operator is aware of
the specic regulations relating to the
machine when driving on public roads.
As transport regulations vary regionally,
the regulations which apply to your locality
should be complied with in terms of this
machine. Note specific requirements
regarding implement width, speed, and
features such as lights and brakes: ensure
these are complied with (for example keep
to maximum transportation speeds with
machines if not tted with brakes, and/or
according to machine transportation width).
1.6 Servicing &
Maintenance
Ensure that regular checks and inspections
are always carried out within the periods
required by law or specified in these
Operating Instructions.
When carrying out service and maintenance
work always:
switch off the tractor engine and remove
the ignition key.
wait until all the machine parts have
stopped moving.
Pay particular attention to those items which
require specialist service tools or training
to be carried out by qualied personnel. Do
not attempt to service these items yourself!
These include items retaining pressure (e.g.
accumulator circuits), or force (e.g. spring
tines), and DD axles of any type.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 31 32

Comments to this Manuals

No comments