Great Plains Mfg., Inc. Front Parts Installation Instructions 3
6/23/2010 Front Parts 166-263M
Pre-Assembly Preparation
Tools Required
• suitable tractor for positioning and operating the air
drill or cart
• the seed monitor console to be used with this imple-
ment (or a 2008 or later DICKEY-john
®
IntelliAG
®
10in LCD console)
• basic hand tools, including (for older ADC2350/B
only), a drill with bit size:
1
⁄
4
in (0.250in), letter size E, or 6.3mm
Prepare Drill
The mechanical installation may be performed on a dis-
connected air cart, but software update (if required), and
testing/configuration of the system require the complete
air drill, and an IntelliAG
®
virtual terminal.
Work Location
5. Move the air cart or air drill to a location with:
6. NTA607/2007HD and NTA907/3007HD only:
Fold drill. Lower openers. This eases access to the
meters.
7. Shut off tractor or hydraulic source.
• room to fold it (NTA607/2007HD and NTA907/
3007HD only);
• access to tractor or hydraulic power;
• access to DICKEY-john
®
IntelliAG
®
console and
12Vdc power;
• adequate illumination; and,
• clear surface beneath for recovery of any falling
or dropped parts - if the surface is not clear, have
a tarp or drop cloth available.
Comments to this Manuals