Great-plains VARIABLE RATE KIT Operator Manual User Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 22
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
4 Air Drill Variable Rate Kit Front Parts Great Plains Mfg., Inc.
166-263M Front Parts 6/23/2010
Update Monitor Software
For models NTA607HD, NTA907HD, NTA2007HD or
NTA3007HD, continue at step 18 on page 5.
This step is performed first in the unlikely event that there
is any incompatibility between your IntelliAG
®
virtual ter-
minal, and the latest version of the Air Cart Control soft-
ware supplied in the kit.
If you are unable to update the seed monitor system, do
not continue the update. Have your Great Plains dealer
contact the factory for assistance.
Refer to Figure 3
8. Check the seed monitor Software Version per the
11001-1507 guide. If the Software Version
a
is:
4.21 or higher,
you do not need to update the seed monitor soft-
ware. If no update is required, continue at step 18
on page 5.
9. If you require a software update, and the SD card is
missing from the kit, contact Great Plains to obtain
the update.
10. Select from the kit one new:
11001-1507 ACC V4 SOFTWARE REPROGRAMMING
This is a DICKEY-john
®
manual describing the pro-
cess of updating the software for the virtual terminal
(if needed) and the WSMT (if needed).
11. Follow the instructions in the reprogramming
manual to check the VT part number (on back of
terminal) and the software version of your seed
monitor (icon ).
12. Record Current Configuration
Monitor configuration may reset to defaults during
update. If either VT or WSMT will be updated,
record the current air drill configuration, particularly
the Material Library. Although newer virtual termi-
nals support exporting the configuration to a blank
SD card, Great Plains recommends making a paper
record, as an imported SD configuration may be
altered during Auto Config at step 79.
13. Select from the kit one new:
INTELLI-AG SOFTWARE UPDATE SDC
This is a small Secure Digital (SD) flash memory
card. When instructed, the card is inserted in a
slot at the lower right corner of the VT bezel, behind
a flip-up door .
14. Select one each new from the kit:
110011512 ACC USR MANUAL VER 4.2 LVL 2&3
110011513 ACC USER MANUAL VER 4.2 LVL 1
The new software introduces user access levels,
and requires a password, described in the Pass-
word Access manual .
15. Follow the instructions in the reprogramming
manual . Software is already provided on a for-
matted SD card, so perform no steps calling for:
- media formatting or
- extranet downloading.
16. The new variable rate controller is not yet installed,
and will not be detected by the new software. After
installing the new hardware, a complete Setup/Con-
figuration is performed starting on page 15 of these
instructions.
17. Shut down the monitor. Shut off the tractor ignition
(to assure that monitor circuits are powered off).
a. This is displayed as “Software Version” and is not the “O.S. Version” nor the “Bootloader Version”.
Figure 3
10in Virtual Terminal and SD Card
29504
2
37
3
1
1
38
38
2
37
37
3
12
13
13
38
Page view 3
1 2 3 4 5 6 7 8 9 ... 21 22

Comments to this Manuals

No comments