Great-plains NP4000B Operator Manual User Manual Page 79

  • Download
  • Add to my manuals
  • Print
  • Page
    / 200
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 78
Great Plains Manufacturing, Inc. Table of Contents Index Operating Instructions 75
2014-05-14 Table of Contents Index 417-199M
Liq: Tank Lid Fill
Employ two persons for top fill; one to secure the hose at
the tank, the other to control a supply line shut-off valve.
These steps presume completion of step 1 through
step 5 on page 74.
Refer to Figure 52 and Figure 6 or Figure 5 on page 29 or 28
13. Close selector valve (or set to PUMP; there is no
risk of material leakage through the boom until the
pump is operating).
14. Open both tank discharge valves to the selector
valve, if cross-filling from one tank to the next is
desired.
15. Open the lid of the tank to be filled.
The tank lid completely unscrews for a 7 in (18 cm)
opening.
16. Insert the supply hose.
17. Open the supply line valve. Monitor tank level. Fill to
desired level. Close supply valve.
18. Remove hose. Close and secure the tank lid. The lid
has twin threads. Make sure that both are evenly
engaged when tightening the lid, and that the lid is
fully seated.
L12
Figure 52
Tank Lid Closed and Open
32083
Chemical Hazard - Tank Lid:
For top loading, wear gloves and any other protective
equipment indicated for any materials that have ever been
used in the tank (not just the materials recently loaded or
presently being loaded). Normal operations splash material on
the underside of the lid. It is likely to be coated with residues
that could be highly concentrated, whether dry, damp or wet.
Remove the lid slowly to avoid throwing off material toward
yourself.
L15
L13
L12
Page view 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 199 200

Comments to this Manuals

No comments