Great-plains YP825AR Operator Manual User Manual Page 121

  • Download
  • Add to my manuals
  • Print
  • Page
    / 166
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 120
2014-06-17 Table of Contents Index 401-923M
Great Plains Manufacturing, Inc. Table of Contents Index 117
Options
Seed Monitor
One of four monitor options (one of which is no monitor)
must be selected with the initial planter purchase. This
election controls the harness installed.
A CANbus (ISO 11783) harness is required for
hydraulic drive, Swath Command™ or Row-Pro™.
A DICKEY-john
®
IntelliAg
®
AI-120 monitor is also
required for Row-Pro™.
For the no-monitor option, the harness components
provided (ECU, WSMB, sensors) are DICKEY-john
®
IntelliAg
®
compatible.
Seed Meter Drive
The ground drive powers seed metering, and if installed,
dry fertilizer metering. Ground drive rates are controlled
by selections of included Range and Transmission
sprockets.
Hydraulic drive powers only seed metering. Seed rates
are controlled by the seed monitor.
Note: Hydraulic drive requires one of the CANbus
monitor options (above) and a compatible console.
Description Option Harness
DICKEY-john
®
PM300 (61) PM300
DICKEY-john
®
AI-100 (62) CANbus
DICKEY-john
®
AI-120 (63) CANbus
No monitor (64) CANbus
32487
34255
34698
2
1
3
3
1
2
Description Option Monitor Required
Ground Drive (55) {any}
Hydraulic Drive (56) CANbus
34733
4
5
4
5
Page view 120
1 2 ... 116 117 118 119 120 121 122 123 124 125 126 ... 165 166

Comments to this Manuals

No comments