Great Plains Manufacturing, Inc. Table of Contents Index Operating Instructions 81
2014-05-14 Table of Contents Index 417-199M
NH
3
Checklist (Cart Hitched)
Page
Check breakaway firmly mated 64
Check breakaway swivel function 64
Remove inlet Acme cap. 64
Inspect inlet with mirror. 64
Check withdrawal valve and all nurse tank
hose valves closed
65
Check for signs of liquid NH
3
in hose 65
Separate hose and Acme plug 65
Route hose to breakaway 65
Connect hose to breakaway 65
Plumbing Checklist Page
Tank(s) loaded -
Supply hose shut-off valve closed 30
Liq: Discharge valve(s) open to pump 30
Liq: Vent (if any) open 30
Tank hose(s) routed to applicator
connectors, mated and locked
33
Hose slack adjusted. 33
Unused hoses secured -
Comments to this Manuals